Gastonia · issues
Civic issues
Topics getting the most attention in Gastonia public meetings, ranked by how frequently they come up.
Road Construction
Gastonia is planning a major 3.5-mile overhaul of West Sugar Creek Road starting in 2028, bringing fresh pavement, new sidewalks, and safer crosswalks to your commute. It's all about making the road smoother and safer for drivers and pedestrians alike.
Road Closures
Heads up, Gastonia commuters—President Trump is in town today, meaning major road closures and messy traffic. You'll want to check alternative routes before heading out to avoid getting stuck.
GoGastonia Microtransit Fare and Surcharge Discussion
The Transportation Department proposed raising microtransit fares from $2.50 to $3.00 and adding a distance-based surcharge for trips over five miles. Public survey feedback showed strong opposition to the surcharge due to affordability concerns.
Project CHANGE Downtown Connectivity and Feasibility Study
The city received a $2 million federal grant, matched with $500,000 in local bond funds, to study capping the downtown railroad ditch. The project aims to reconnect the historic Highland neighborhood to downtown Gastonia and evaluate future economic development potential.
Gastonia Municipal Airport Apron Pavement Rehabilitation
The city is putting up $463,261 as a local match to secure over $3.8 million in state and federal funds to repave crumbling apron pavement at the municipal airport.
Public Transit
Gastonia is ditching its old-school fixed bus routes for an on-demand microtransit system, which means you'll have to use a new way to get around town. Think of it more like a local rideshare app rather than waiting for a bus that runs on a rigid schedule.
Public Transit Overhaul
Gastonia is ditching its old-school fixed bus routes for an on-demand microtransit service starting in July 2024. This means you'll be able to hail a city ride much like Uber or Lyft, completely changing how you navigate the town.